How to read a co-packer quote: what the tolling fee leaves out
A co-packer quote is a price list, not a unit cost. Here are the lines a tolling fee leaves out, and the question to ask on each one.
A quote is a price list, not a unit cost.
A co-packer quote tells you what the plant charges to run your liquid. It does not tell you what a finished can costs you. Founders who divide the run fee by the number of cans and stop there tend to get surprised later, because several of the biggest costs sit outside that line.
Start by finding out what the number covers. A tolling fee usually pays for the production work: batching, filling, sealing and packing. Materials, setup and changeover, testing, storage and freight may be priced separately, or not at all. A blank line on a quote is an open question, not a zero.
Then build the cost of one finished can from the bottom up, in cans rather than cases: ingredients, cans and ends, trays or carriers, the plant’s fee, product lost to startup and rejects, freight in and out, storage after any free window, and testing. Add it up at the run size you can actually sell.
Below is the line-by-line list we use, with the question to ask the plant on each line. If you would rather have it read for you, email your quote to ben@genwest.ventures. Our Co-Pack Quote & Contract Review is available starting at $1,500.
Where a line comes from a published source, the source is named next to it and listed at the bottom. Checked Nov 28, 2026.
What a tolling fee usually covers, and what it usually doesn’t.
Two plants can send you quotes that look close and describe two different jobs. One may include the cans, the ingredients and the purchasing. The other may price only the production work and leave the rest to you. The first thing to settle is which of those you are looking at.
Usually in a tolling fee
- The production work: batching, processing, filling, sealing and packing
- Basic in-line quality checks
- Changeover and sanitation, sometimes. Some plants bundle it and some bill it
Often priced separately, or not quoted
- Ingredients and packaging
- Product and packaging lost to startup, shutdown and rejects
- Lab and shelf-life testing, and process authority work
- Storage, by the pallet by the week
- Freight in and out
- Label application, if your cans are not pre-printed
Based on JAI Development’s tolling guide (published Oct 28, 2026) and Alias Advising’s page on what it costs to co-pack an RTD. Every plant quotes differently, so use both lists as prompts, not rules.
JAI makes the same point about turnkey: a low production fee can look good until you notice the other quote includes the cans, the ingredients and the purchasing support. If you cannot tell which model a quote assumes, read our guide to turnkey vs tolling first.
Line by line: what to ask on each part of the quote.
Use this as a checklist. Put the plant’s answer next to each line, and write “not stated” where the quote is silent. The last column says where the line comes from. “Our advice” means no outside source: it is a question we think you should ask.
| Line | What to ask the plant | Where it hides | Basis |
|---|---|---|---|
| Fee basis | Is the fee per can, per case, per gallon or per hour of line time? What run size was it priced at? | A per-hour fee needs a line speed behind it. A per-case fee depends on the run size it was priced at. | JAI, Alias |
| Minimum run | Per SKU or per run? Does it change with the line or the format? What is it in cans? | A good rate at a minimum you cannot sell through is worse than a mediocre rate at a run you can move. | Alias |
| Setup, changeover and sanitation | Is it in the fee, or billed each run or each SKU change? | One plant bundles it. The next one lists it on its own line. | Alias |
| Assumed yield and scrap | What yield does this number assume, and what happens if the run comes in under it? | Liquid and packaging lost at startup, shutdown and rejects. If the quote does not say, ask. | Alias, JAI |
| Who buys materials, and the markup | Who orders the cans, ends, trays and ingredients? If the plant orders, what does it add? | A tolling fee sitting next to a turnkey price. | JAI |
| Leftovers after the run | Who owns leftover cans and ingredients, where do they sit, and can they roll into the next run? | Supplier minimums leave unused material. A plant placing the order does not mean the plant absorbs what is left. | JAI |
| Label application | If cans are not pre-printed, who applies labels and what does it cost? | It only shows up if you are not running pre-printed cans. | Alias |
| Lab, shelf-life and process authority work | Who does the testing, who pays, and how much time does it add before you can ship? | Usually not in the run fee. | Alias |
| Receiving and storage | Is there a free storage window? What is the rate per pallet per week after it, and when does the clock start? | Storage can run from the day the run ends. | Alias |
| Freight in and out | Who books it and who pays? Inbound cans and ingredients, and finished pallets out. | Freight lanes can quietly add up to more than the tolling fee. | Alias |
| Palletizing and wrap | Are pallets, wrap and palletizing in the fee? | One plant publishes them as their own line item. See the worked example on the launch-cost page. | Launch-cost page |
| Deposits and payment timing | What is due to start, what is due before the run, and what secures it? | A contract should say what is paid, how, and when it is due. | UF/IFAS |
| Quote validity and version | How long is this quote good, and is this the version the agreement will refer to? | Quotes get re-issued. Keep each one with its date. | Our advice |
| What triggers a price change | What lets the plant reprice mid-term, and how much notice do you get? | Often in the agreement, not the quote. See price-change rights. | Our advice |
Sources: JAI Development, Alias Advising, University of Florida IFAS Extension, Finding and Using a Co-packer. The table scrolls sideways on a phone.
Turn it into the cost of one finished can.
Plants quote in cases, per hour, per gallon. Your margin lives in cans. Convert everything to cans before you compare anything.
- Cases to cans. Cases times units per case. Our RFP checklist uses an illustration of 3 flavors at 1,000 cases each, with 24 cans per case, which is 72,000 cans. That is arithmetic, not a forecast.
- Fee per can. The plant’s fee for the run, divided by the cans in the run.
- Add every line you had to ask about. Even the ones the plant answered with “TBD”. Materials, scrap, freight, storage and testing all go in.
- Divide by sellable cans, not filled cans. Product lost to startup and rejects is paid for and cannot be sold.
- Compare at the same run size. A rate at a bigger run is not a rate at yours.
The result is the cost of one finished can: every dollar spent on the run, divided by the cans you can sell. For a worked example with published figures, see what it costs to launch a canned beverage.
Ask the same three questions of every plant.
A blank is an open question, not a zero. If a line is missing from the quote, the plant may not charge for it, or it may charge for it later. Ask which one, and get the answer in writing.
Alias Advising puts it as three questions that separate a real quote from a brochure: “what is your assumed yield, what is not included in this number, and what has to be true before you can schedule me?” Put those at the top of every quote request you send.
Then keep the comparison fair. Ask every plant to price the same scope: same formula, same can, same run size, same list of who buys what. Keep each quote with its date and version, and note which version the agreement refers to. If the quotes still do not line up, email them to ben@genwest.ventures and we will line them up for you.
Quote from Alias Advising.
Related guides.
These cover the parts of a quote that tend to get lost between the price sheet and the agreement.
- 12 co-packing contract terms that cost founders money: the agreement side of the same question
- Turnkey vs tolling: who buys the materials and what that does to the number
- What it costs to launch a canned beverage: published line items and a worked example
- Co-packer RFP checklist: what to have ready before you ask for quotes
- Co-packer RFP template: the workbook to send so a plant can quote
- Co-packer sourcing and COGS and margin engineering: how we help
Sources
- JAI Development, Tolling in Manufacturing: A Beverage Founder’s Guide, published Oct 28, 2026. Read Nov 28, 2026.
- Alias Advising, What Does It Cost to Co-Pack an RTD? Read Nov 28, 2026.
- University of Florida IFAS Extension, Finding and Using a Co-packer (FS380), published May 2020.
- The 72,000 can illustration is from the GenWest co-packer RFP checklist.
Holding a quote? Send it over.
Email your quote to ben@genwest.ventures and we will turn it into a cost per can. The Co-Pack Quote & Contract Review is available starting at $1,500. Price is set before we start, based on what you send.
Not legal advice. We work alongside your attorney, and we will recommend one if you do not have one.
We treat submitted project information as confidential, as stated in our Terms.
Co-pack quote review · Contract terms · RFP template · Co-packer RFP checklist · Co-packer sourcing · COGS and margin engineering · Back to the home page